S11015 FIMER transformerless MV CENTRALIZED STORAGE INVERTER, with an Nominal AC Voltage  of 400 VAC and a battery voltage range of 675 – 1250 VDC, is a bidirectional three phase inverter specifically designed for implementing storage solution in large-scale plant and MV connected installation.
Storage blu

FIMERS CENTRALIZED STORAGE INVERTERS (ESS) are suitable for any type of storage applications like:

RENEWABLE ENERGY GENERATION

Capacity firming: power generation by a renewable source can be maintained at a defined level for a period of time having the ESS compensating the energy. Voltage and power swings on the network are smoothed as well.

Four quadrant operation: the ESS is able to generate or absorb both Active and Reactive power.

Peak shaving: the excess of the energy produced can be stored and be released when needed. Therefore grid or generators upgrades can be postponed and the price of energy can be maximised.

Fault Ride Through - FRT: the ESS can support the FRT according to the local requirements.

Frequency regulation: in case of Grid frequency increase or decrease, the Energy Storage System absorbs or releases Active power with an extremely rapid time response.

GRID ANCILLARY SERVICES

Frequency regulation: in case of Grid frequency increase or decrease, the Energy Storage System is charged or discharged with an extremely rapid time response.

Spinning reserve: the Energy Storage System is charged and ready to respond to a Grid (generation or transmission) outage. The time response is adjustable according to the network requirements. The operation of the generators can be optimised since idle capacity is no more necessary.

Voltage regulation: in case of Grid voltage increase or decrease, the Energy Storage System is charged or discharged with an extremely rapid time response.

Capacity firming: power generation by a renewable source can be maintained at a defined level for a period of time having the ESS compensating the energy. Voltage and power swings on the network are smoothed as well.

Load leveling: the excess of the energy produced can be stored and be released during high demand periods. Therefore grid or generators upgrades can be postponed and the price of energy can be maximised.

Peak shaving: in case of variable loads, the energy peak demand can be supplied by the ESS. Therefore network or generation investments can be avoided or postponed and the cost of energy can be minimised.

A typical application is in Railroad (Railway, Metro, Tramway and Trolleybus) where the accelerating or breaking of trains generate peaks (in demand or supply) that can be absorbed by the ESS.

Power quality: thanks to the fast response time, the ESS helps to protect the loads against short duration events (voltage dips, frequency variation, etc.) that affect the quality of the energy. 

MINI GRID & ENERGY MANAGEMENT

On-line management of the power flows between the different sources

Contemporary load supply with all the sources: PV, Batteries, Diesel Genset and Grid

Load supply from the Grid through a by-pass or through the Power Converter.

Islanding: Off-grid operation mode with only PV and Batteries

Outage management: automatic and seamless transition from Grid-Tied to Off-Grid operation (depending on the ESS configuration)

Batteries charging from PV or from Grid even during Load supply

Highlights

  • Max Efficiency , up to 98,9%

  • Nominal AC Voltage : 400 VAC +-10%

  • Battery Voltage Range : 675 - 1250 VDC

  • Max power : 1025 kW

  • Modular inverter (MPS system)

  • Elimination of machine down-times

  • East maintenance

  • Large lifetime

  • Use of a single magnetic component each module

  • Advance modularity (according to IPCCM algorithm)

  • Continous monitoring of the system and integrated datalogger

  • Outbound communication.